User Tools

Site Tools


network_stuff:lld_notes

This is an old revision of the document!


# RA

  1. Introduction: like in situation, motivations (in case of solving an issue, etc..)
  2. Business context.
    1. Use cases.
    2. To-be 'process'

# Index 1

  • Project Delivery
    • Pre-requisites
    • Scope of Works
    • Project Management
  • Quotation

# Index 2

  • STATEMENT
  • OBJECTIVE
  • APPROACH
  • PHASES - PoC > RFQ > MVP > ENTERPRISE
  • Steps
    • Pre-requisites
    • Scope of Works
    • Project Management
  • Quotation

Introduction

Project Overview Purpose of the Document Network Topology

Description of the LAN and WAN Physical Layout of the Building Connection to Core Switches in the Data Center Infrastructure Components

Cisco 9300 Switches Configuration Details Stack Setup Access Points (APs) Deployment Strategy Coverage Areas Physical Layout

Floor-wise Distribution of Equipment Location of Communication Rooms Rack Configuration in Communication Rooms Addressing Scheme

IP Addressing Plan VLAN Assignment Wireless Network Configuration

SSID Configuration Security Protocols Roaming and Handoff Strategies Security Measures

Access Control Lists (ACLs) Firewall Configurations Physical Security Measures Quality of Service (QoS)

Traffic Prioritization Bandwidth Allocation Monitoring and Management

SNMP Configuration Logging and Alerting Setup Management Interfaces Redundancy and High Availability

Redundant Links Device Failover Strategies Documentation of Racks

Rack Inventory Patch Panel Details Testing and Validation

Test Plans Validation Procedures Appendix

Supporting Documentation Diagrams and Visuals


# ASSESSMENT

  1. Executive summary
  2. Full Assessment
  3. Comparisons
  4. Options
network_stuff/lld_notes.1701789547.txt.gz · Last modified: by jotasandoku